Completed in January of 2014, HostDime’s Corporate headquarters is located in Research Park near the campus of the University of Central Florida. HostDime is committed to hiring local talent, with a large number of UCF students and alumni on staff. The 15,000 square foot office is the hub for all of HostDime’s properties and houses HostDime’s 24/7 support staff, sales staff and Abuse & Security Team, as well as developmental operations. This location includes a 1,000 square foot fully-redundant IT room with UPS and generator backup and corresponding diesel fuel reserve.

Corporate building outside image Corporate building inside image

HostDime Data Center

HostDime’s current premier data center in Central Florida is located near Maitland in Orlando, Florida. Our facility consists of 25,000 square feet, with on site personnel 24/7/365. Our datacenter is secured with electronic access control and physical security to ensure that your hardware and data is secure as possible. Our state-of-the-art-network is powered by Brocade routers and Juniper & Cisco Switches. Our network utilizes redundant edge and core routers to distribute network connectivity to our Juniper & Cisco 10G access switches to every rack.

Data Center Img1

Data Center

  • 25,000 square feet
  • Single-story building with concrete masonry perimeter walls
  • Category 4 storm resistant
  • Client Conference Room
  • Client Lounge Area
Data Center Img2

Facility Security

  • On-site personnel 24x7x365
  • Electronic access control and physical security
  • Interlocking Man-trap entry points with badge-only access and Biometric Hand Readers provided by ADT Security
  • Over 50 IP Cameras provide Video surveillance throughout the Data Center
Data Center Img3

Power Infrastructure

  • 1 X 500KW Caterpillar Diesel Generator
  • 1 X 1250KW Katolight Diesel Generator
  • 1 X 500KVA Powerware 9315 UPS
  • 1 X 480KVA Powerware 9390 UPS in a parallel N+1 configuration
  • 5 X Battery Strings (providing 15 minutes of runtime at full load)
  • 2,700 Gallons of fuel capacity for generators
  • Routine systems testing and maintenance
Data Center Img3

Air Conditioning

  • Constant 72F/45% humidity precision control
  • Separate cooling zones
  • 359 Tons of total cooling capacity composed of the following:
  • 6 x 30 Ton Liebert CRAC Units
  • 3 x 20 Ton Liebert CRAC Units
  • 2 x 15 Ton Liebert CRAC Units
  • 2 x 25 Ton Package Air Units
  • 1 x 15 Ton Package Air Unit
  • 2 x 12 Ton Package Air Unit

Our Future

HostDime broke ground on November 16th, 2016 on the seven-story, 85,000 square foot world class data center facility and new company headquarters north of downtown Orlando in Eatonville, FL. The new building will combine HostDime's existing data center near Maitland, FL with the corporate offices. HostDime forecasts a 2018 grand opening of the owner occupied building.

New building front image New building side image
  • Seven story facility encompassing 85,000 square feet with a full commercial kitchen
  • World class datacenter space on three floors
  • Offices and workspaces for all US staff
New building corner image New building back image
  • Business suites and amenities for clients
  • An indoor/outdoor event space for tech community events and HostDime events.
  • A multi floor lobby atrium and top floor sports court

Our History

Have Questions?

HostDime developers work on critical operation components
that allow customers to easily purchase products, access tickets.

Trexi icon Chat